LiftMaster TDC Installation Manual - English French Spanish - Page 20
Mount the Operator, Secure the Chain Hoist
View all LiftMaster TDC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 20 highlights
JDC/JHDC Installation (continued) Mount the Operator The wall or mounting surface MUST provide adequate support for the operator. The surface must: • Be rigid to prevent play between the operator and the door shaft. • Provide a level base. • Permit the operator to be fastened securely and with the drive shaft parallel to the door shaft. 1. Place the door sprocket on the door shaft so it can be moved to align vertically with the operator drive shaft. 2. Insert the keys and fasten the sprockets with the set screws (recommended torque for the set screws is 34-45 in/lb). 3. Hold the operator in the desired mounting position so the door sprocket and the drive sprockets are vertically aligned. 4. Mount the operator to the wall or mounting plate where the operator can be moved to aligned with the appropriate hardware (not supplied). 5. Wrap the drive chain around the door sprocket and the drive sprocket, then secure with the master link. NOTE: Chain links may need to be removed to achieve appropriate chain length. NOTE: It is highly recommended to add a thread adhesive to secure the set screws in place. 2 1 5 Secure the Chain Hoist 1. Fasten the door retaining bracket 4 feet (1.2 m) above the floor. NOTE: If the position of the operator causes the hand chain to hang in the door opening hook the chain to the side near the top of the door jamb. 20 Door retaining bracket