Panasonic WU-192ME2U9 Technical Data Manual - Page 105
Wiring for the Receiver, Wiring Diagram, 42. Test Operation, CZ-RWSC3, Supplied Accessories
![]() |
View all Panasonic WU-192ME2U9 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 105 highlights
52. Wireless Remote Controller CZ-RWSC3 2-39. Supplied Accessories Supplied accessories Wood screw M4 × 15.5 (2) C lamper (1) CoCntoronltroof l2oWfAVYRVFRSFYSSYTSETMEMS 2-40. Setting ■ Main / Sub setting ■ Address setting 1 Remove the top case of the receiver for setting Switch Main / Sub setting ˔Use this to set Main/asub for the remote controller and the receiver. ˔Set one to [Main] and the other to [Sub]. 2 ˔Factory default : [Main] ˔It is recommended to set the wired remote controller to [Main]. Main / Sub Main Sub 3 Main / SubTXJUDIQPTJUJPO 1234 1234 2-41. Wiring for the Receiver 4 Wiring Diagram Type of wiring Use cables of 0.5 to 1.25 mm2. Indoor unit Receiver Total wire length: 400 m or less R1 1 (The wire length between indoor units should be 200 m or less.) Number of connectable units R2 RC wiring ( eld supply) 2 No polarity Terminals for RC wiring 5 Remote controller and receiver: Max. 2 Indoor unit: Max. 8 2-42. Test Operation Preparation : Turn on the circuit breaker of units and then turn the power on. After the power is turned on, remote controller operation is ignored for approx. 1 minute because setting is being 6 made. This is not malfunction. (Contents received while setting are disabled.) 1. To start test operation, press and hold the emergency operation button for 10 seconds. 2. The indication lamps (OPERATION, TIMER, STANDBY) blink during test operation. 3. To finish test operation, press and hold the emergency operation button for 10 seconds. 7 8 3 - 33 9
![](/manual_guide/products/panasonic-u72me2u9-technical-data-manual-ec761eb/105.png)