LiftMaster HDSL24UL Installation Manual - English - Page 11
Step 2 Install the Operator
View all LiftMaster HDSL24UL manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
INSTALLATION Step 2 Install the Operator Attach the operator to the concrete pad with appropriate fasteners. The gate operator should be installed near the front roller of the gate or near the back of the gate (in the OPEN position). The space between the gate and the output sprocket must be a minimum of 4 inches (10.2 cm). NOTE: An alternative to a concrete pad is to post mount the operator (refer to Accessories). 4 Concrete Anchors 1/2" x 3 1/2" Post Mount 4" (10.2 cm) (chain location) 11
11
Step 2 Install the Operator
Attach the operator to the concrete pad with appropriate fasteners. The gate operator should be installed near the front roller of the gate or near the back of
the gate (in the OPEN position). The space between the gate and the output sprocket must be a minimum of 4 inches (10.2 cm).
NOTE:
An alternative to a
concrete pad is to post mount the operator (refer to Accessories).
Post Mount
4 Concrete Anchors
1/2" x 3 1/2"
4" (10.2 cm)
(chain location)
t Moun
INSTALLATION