LiftMaster HDSL24UL Installation Manual - English - Page 10
Step 1 Determine Location for Operator, Standard Installation
View all LiftMaster HDSL24UL manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
INSTALLATION Step 1 Determine Location for Operator Check the national and local building codes before installation. Standard Installation 1. The gate operator should be installed near the front roller of the gate. Lay out the concrete pad. 2. Install the electrical conduit. 3. Pour a concrete pad (reinforced concrete is required). 1/2" (1.8 cm) (conduit location) (Gate) 1"-2" (2.5-5.1 cm) Front gate roller (Pad) (conduit) Rear Installation 1. The gate operator should be installed near the back of the gate in the OPEN position. Lay out the concrete pad. 2. Install the electrical conduit. 3. Pour a concrete pad (reinforced concrete is required). 1/2" (1.8 cm) (Gate in open position) 1"-2" (2.5-5.1 cm) Back of gate (conduit location) (Pad) (conduit) 6" (15.2 cm) Above Ground Below the frost line. Check all national and local codes. 6" (15.2 cm) Above Ground Below the frost line. Check all national and local codes. 10