LiftMaster HDSL24UL Installation Manual - English - Page 10

Step 1 Determine Location for Operator, Standard Installation

Page 10 highlights

INSTALLATION Step 1 Determine Location for Operator Check the national and local building codes before installation. Standard Installation 1. The gate operator should be installed near the front roller of the gate. Lay out the concrete pad. 2. Install the electrical conduit. 3. Pour a concrete pad (reinforced concrete is required). 1/2" (1.8 cm) (conduit location) (Gate) 1"-2" (2.5-5.1 cm) Front gate roller (Pad) (conduit) Rear Installation 1. The gate operator should be installed near the back of the gate in the OPEN position. Lay out the concrete pad. 2. Install the electrical conduit. 3. Pour a concrete pad (reinforced concrete is required). 1/2" (1.8 cm) (Gate in open position) 1"-2" (2.5-5.1 cm) Back of gate (conduit location) (Pad) (conduit) 6" (15.2 cm) Above Ground Below the frost line. Check all national and local codes. 6" (15.2 cm) Above Ground Below the frost line. Check all national and local codes. 10

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60

10
Step 1 Determine Location for Operator
Check the national and local building codes before installation.
Standard Installation
1.
The gate operator should be installed near the front roller of the gate. Lay out the concrete pad.
2.
Install the electrical conduit.
3.
Pour a concrete pad (reinforced concrete is required).
(Gate)
Front gate roller
(conduit)
Below the frost
line. Check all
national and local
codes.
6" (15.2 cm)
Above Ground
1/2" (1.8 cm)
1"-2" (2.5-5.1 cm)
(Pad)
(conduit
location)
Rear Installation
1.
The gate operator should be installed near the back of the gate in the OPEN position. Lay out the concrete pad.
2.
Install the electrical conduit.
3.
Pour a concrete pad (reinforced concrete is required).
(conduit)
Back of gate
(Gate in open position)
Below the frost
line. Check all
national and local
codes.
6" (15.2 cm)
Above Ground
1/2" (1.8 cm)
1"-2" (2.5-5.1 cm)
(Pad)
(conduit
location)
INSTALLATION