Adaptec 5405 User Guide - Page 167
The Task Manager?, The Advanced Statistics Manager
UPC - 760884155585
View all Adaptec 5405 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 167 highlights
Appendix C: Quick Answers to Common Questions... ● 167 The Task Manager? In the tool bar, click Configure, point to the system you want, then click Tasks. In the menu bar, select Actions to view these options: The Advanced Statistics Manager In the tool bar, click Configure, point to the system you want, then click Advanced Statistics. In the menu bar, select Actions to view these options: What tasks can be scheduled to run at a specified time? You can schedule any of these tasks to run at a specified time: ● Changing a logical drive from one RAID level to another (see page 70). ● Expanding the size of a logical drive (see page 69). ● Modifying a logical drives settings (see page 63). ● Verifying a logical drive (see page 68) or verifying and fixing a logical drive (see page 67). See Scheduling a Task on page 81 for more information.