2012 Kawasaki KX250F Owners Manual - Page 66
2012 Kawasaki KX250F Manual
Page 66 highlights
64 MAINTENANCE AND ADJUSTMENT the intake air pressure sensor connector, • Connect upstream injector connector, downstream injector the rear frame with the air cleaner housing • Install to the throttle body assy. the duct is installed securely. • Check • Check the clamp position as shown in the figure. connector and throttle sensor connector. the rear frame mounting bolts to the spec• Tighten ified torque. Tightening Torque Rear Frame Mounting Bolts: 34 N·m (3.5 kgf·m, 25 ft·lb) the fuel hose joint straight onto the upstream • Insert injector pipe. the yellow paint of the hose in the upstream • Check injector pipe side. • Push the joint lock until the hose joint clicks. j A. Clamp • Tighten the clamp screws securely. Tightening Torque Throttle Body Assy Holder Clamp Screw: 2.0 N·m (0.20 kgf·m, 18 in·lb) Air Cleaner Duct Clamp Screw: 2.0 N·m (0.20 kgf·m, 18 in·lb) A. Fuel Hose Joint B. Yellow Paint C. Joint Lock