LiftMaster RSL12U RSL12U Troubleshooting Guide Manual - Page 17

Solar, Solar Troubleshooting - manual

Page 17 highlights

SOLAR SOLAR TROUBLESHOOTING SYMPTOM The operator alarm will beep three times with a command and the BATT LOW LED will be on when the solar panel is not charging the battery. SOLUTIONS • Check that the correct number of solar panels are connected to the operator. 12V operators require one 10W 12V panel up to a maximum of three 10W 12V panels. 24V operators require two 10W 12V panels up to a maximum of six 10W 12V panels. • Check that the correct batteries are used for the application. • Check that the whole panel(s) is facing south within 150 feet of the operator and receiving full sunlight. Make sure the solar panels are not in the shade. • Check that the accessories are not drawing too much current. Use LiftMaster low current draw accessories. • Check that the number of gate cycles does not exceed the cycle ratings for the operator and application. • Check that the number of gates cycles corresponds with the solar zones (see below). Refer to your gate operator manual for specific gate cycles. SOUTH SOLAR ZONES 1 ZONE 1 (6 Hours of Sunlight/Day): Ideal for solar application 2 ZONE 2 (4 Hours of Sunlight/Day): Recommended for solar application 3 ZONE 3 (2 Hours of Sunlight/Day): Success of solar application will depend on type of gate operator and location of the solar panel NOT AVAILABLE 1 16 NOT AVAILABLE 3 2 1

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36

16
SOLAR
SOLAR ZONES
ZONE 1 (6 Hours of Sunlight/Day):
Ideal for solar
application
ZONE 2 (4 Hours of Sunlight/Day):
Recommended
for solar application
ZONE 3 (2 Hours of Sunlight/Day):
Success of
solar application will depend on type of gate
operator and location of the solar panel
NOT AVAILABLE
3
2
1
NOT AVAILABLE
1
1
2
3
SOLAR TROUBLESHOOTING
SYMPTOM
The operator alarm will beep three times with a command and the BATT LOW LED will be on when the solar panel is not charging the battery.
SOLUTIONS
Check that the correct number of solar panels are connected to the operator. 12V operators require one 10W 12V panel up to a maximum of three
10W 12V panels. 24V operators require two 10W 12V panels up to a maximum of six 10W 12V panels.
Check that the correct batteries are used for the application.
Check that the whole panel(s) is facing south within 150 feet of the operator and receiving full sunlight. Make sure the solar panels are not in the
shade.
Check that the accessories are not drawing too much current. Use LiftMaster low current draw accessories.
Check that the number of gate cycles does not exceed the cycle ratings for the operator and application.
Check that the number of gates cycles corresponds with the solar zones (see below). Refer to your gate operator manual for specific gate cycles.
SOUTH