LiftMaster RSL12U RSL12U Installation Manual - Page 12

Install The Operator

Page 12 highlights

INSTALLATION STEP 2 INSTALL THE OPERATOR Attach the operator to the concrete pad with appropriate fasteners. The gate operator should be installed near the front roller of the gate or near the back of the gate (in the OPEN position). The space between the gate and the output sprocket must be a minimum of 4 inches. 4 Concrete Anchors 1/2" x 3 1/2" MOUNTING FOOTPRINT .63" 7.49" 13.65" 4" (10 cm) (chain location) (operator) 11

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

11
4 Concrete Anchors
1/2" x 3 1/2"
INSTALLATION
13.65"
MOUNTING FOOTPRINT
7.49"
.63"
STEP 2
INSTALL THE OPERATOR
Attach the operator to the concrete pad with appropriate fasteners. The gate operator should be installed near the front roller of the gate or near the
back of the gate (in the OPEN position). The space between the gate and the output sprocket must be a minimum of 4 inches.
(operator)
4" (10 cm)
(chain location)