LiftMaster RSL12U RSL12U Installation Manual - Page 11
Determine Location For Concrete Pad And Operator
View all LiftMaster RSL12U manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
INSTALLATION STEP 1 DETERMINE LOCATION FOR CONCRETE PAD AND OPERATOR Check the national and local building codes before installation. STANDARD INSTALLATION 1. The gate operator should be installed near the front roller of the gate. Lay out the concrete pad. 2. Install the electrical conduit. 3. Pour a concrete pad (reinforced concrete is recommended). 1" - 2" (2.5 - 5.1 cm) 1/2" (1.8 cm) (conduit location) (Gate) Front gate roller 24" (61 cm) 24" (61 cm) (Pad) (conduit) REAR INSTALLATION 1. The gate operator should be installed near the back of the gate in the OPEN position. Lay out the concrete pad. 2. Install the electrical conduit. 3. Pour a concrete pad (reinforced concrete is recommended). 1/2" (1.8 cm) (conduit location) (Gate in open position) 1"-2" (2.5-5.1 cm) Back of gate 24" (61 cm) 24" (61 cm) (Pad) (conduit) 10 6" Above Ground Below the frost line. Check all national and local codes. 6" Above Ground Below the frost line. Check all national and local codes.