LiftMaster CSL24UL Installation Manual - Page 8

Site Preparation, Conduit and Concrete Pad, Safety, Additional Accessories

Page 8 highlights

INTRODUCTION Site Preparation Check the national and local building codes BEFORE installation. Conduit and Concrete Pad Trench and install conduit. Before trenching, contact underground utility locating companies. Conduit must be UL approved for low and high voltage. Consider the operator placement BEFORE installing the pad or post. Safety Entrapment protection devices are required to protect against any entrapment or safety conditions encountered in your gate application. Install a warning sign (two provided) on the inside and outside of the property, where easily visible. Gate Gate must be constructed and installed according to ASTM F2200 standards (refer to page 4). Gate must fit specifications of operator (refer to specifications). Additional Accessories The vehicle loops allow the gate to stay open when vehicles are obstructing the gate path. Suggested for vehicles 14 feet (4.27 m) or longer. Vehicle loops are not required but are recommended. Before installing your Access Control Device(s) be sure to complete a site survey and determine the best device for your site needs. 8

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

8
Site Preparation
Check the national and local building codes
BEFORE
installation.
Conduit and Concrete Pad
Trench and install conduit. Before trenching, contact underground
utility locating companies. Conduit must be UL approved for low
and high voltage. Consider the operator placement BEFORE
installing the pad or post.
Safety
Entrapment protection devices are required to protect against any entrapment or
safety conditions encountered in your gate application. Install a warning sign
(two provided) on the inside and outside of the property, where easily visible.
Gate
Gate must be constructed and installed according to ASTM F2200
standards (refer to page 4). Gate must fit specifications of operator
(refer to specifications).
Additional Accessories
The vehicle loops allow the gate to stay open when vehicles are obstructing the
gate path. Suggested for vehicles 14 feet (4.27 m) or longer. Vehicle loops are
not required but are recommended. Before installing your Access Control
Device(s) be sure to complete a site survey and determine the best device for
your site needs.
INTRODUCTION