LiftMaster CSL24UL Installation Manual - Page 10

Step 1 Determine Location for Operator, Standard Installation

Page 10 highlights

INSTALLATION Step 1 Determine Location for Operator Check the national and local building codes before installation. Standard Installation 1. The gate operator should be installed near the front roller of the gate. Lay out the concrete pad. 2. Install the electrical conduit. 3. Pour a concrete pad (reinforced concrete is recommended). Rear Installation 1. The gate operator should be installed near the back of the gate in the OPEN position. Lay out the concrete pad. 2. Install the electrical conduit. 3. Pour a concrete pad (reinforced concrete is recommended). 10

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

10
Step 1 Determine Location for Operator
Check the national and local building codes before installation.
Standard Installation
1.
The gate operator should be installed near the front roller of the gate. Lay out the concrete pad.
2.
Install the electrical conduit.
3.
Pour a concrete pad (reinforced concrete is recommended).
Rear Installation
1.
The gate operator should be installed near the back of the gate in the OPEN position. Lay out the concrete pad.
2.
Install the electrical conduit.
3.
Pour a concrete pad (reinforced concrete is recommended).
INSTALLATION