HP XP P9500 HP P9000 Business Continuity Manager Reference Guide (T5253-96058, - Page 293
Address Tso Ykmake Stemdemo_info.myur1. Msgdemo_msg. Hold, Gotohold Timeout10
View all HP XP P9500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 293 highlights
*/ address TSO "YKMAKE STEM(DEMO_INFO.MYUR1.) MSG(DEMO_MSG.) HOLD" /* * Check the return code of YKMAKE. */ if rc /= 0 then do call printErrorMessage end else nop /* * Confirm that the status of the MYUR1 copy pair is one where a * DeltaResync can be performed. */ address TSO "YKEWAIT STEM(DEMO_INFO.MYUR1.) MSG(DEMO_MSG.)", "GOTO(HOLD) TIMEOUT(10)" /* * Check the return code of YKEWAIT. */ if rc /= 0 then do call printErrorMessage exit end else nop exit end else do say "recover to ready state for DeltaResync", "from planned outage configuration." end end /* * Confirm that the status of the MYTCHS copy pair is one where a * DeltaResync can be performed. */ address TSO "YKEWAIT STEM(DEMO_INFO.MYTCHS.) MSG(DEMO_MSG.)", "GOTO(SWAPPING) TIMEOUT(10)" /* * Check the return code of YKEWAIT. */ if rc /= 0 then do call printErrorMessage exit end else nop /* Command details 293