HP AJ732A Cisco MDS 9500 Series Hardware Installation Guide (OL-17467-02, Octo - Page 91
Installing the Cisco MDS 9509 Director in a Rack
UPC - 883585789481
View all HP AJ732A manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 91 highlights
Chapter 2 Installing the Cisco MDS 9500 Series Installing the Chassis in a Cabinet or Rack Send documentation comments to [email protected]. Figure 2-4 Installing the Cable Management Brackets on the MDS 9513 Chassis 3 4 1 2 146038 1 Screws, 12-24 or 10-32 2 Support bracket 3 Mounting rail 4 Cable guide Installing the Cisco MDS 9509 Director in a Rack Caution If connecting a Cisco MDS 9509 Director to a 110-VAC power system, ensure that sufficient power is provided to meet the chassis power requirements for the number of modules installed. When connected to 220 VAC, the 2500-W AC power supplies (DS-CAC-2500W) for the Cisco MDS 9509 Director are designed to provide an output power of 2331 W to power the modules and fans. When connected to a 110 VAC power system, the power supply provides approximately 1150 W. In this case, and if the power supplies are used in redundant rather than combined mode, they might not provide adequate power, depending on the number of modules loaded in the chassis. If a 110-VAC input is chosen, a 110-VAC power cord (CAB-7513AC=) must be ordered separately. Table 2-2 lists the items provided in the Cisco MDS 9509 rack-mount kit. OL-17467-02 Cisco MDS 9500 Series Hardware Installation Guide 2-11