2012 Ducati Monster 696 Owners Manual - Page 90
2012 Ducati Monster 696 Manual
Page 90 highlights
Connect the fuel sensor (11) to the main wiring harness. Position the lambda sensor cable (G) in the specific tab (H) on the tank flange cover and secure it with a clamp. E With the fuel tank lowered, the fuel level sensor connector (11) should rest on the vertical cylinder head, as shown in the figure. Important 11 fig. 87 H G fig. 88 89
89
E
Connect the fuel sensor (11) to the main wiring harness.
Position the lambda sensor cable (G) in the specific tab (H) on
the tank flange cover and secure it with a clamp.
Important
With the fuel tank lowered, the fuel level sensor
connector (11) should rest on the vertical cylinder head, as
shown in the figure.
G
H
fig. 88
11
fig. 87