Maytag MER5750BAQ Installation Manual - Page 6
Service, or Conduit, Installation, ACCEPTABLE, INSTALLATION
View all Maytag MER5750BAQ manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
CONNECTING THE RANGE FIGURE 6 3-Wire Service Cord or Conduit Installation 1. Insure that the copper ground strap IS CONNECTED between the middle post of the main terminal connection block and the range chassis. 2. The middle wire of the service cord or ground lead of 3-wire conduit MUST connect to the neutral (middle) post of the main terminal block. The other two wires of the service cord or conduit connect to the outside posts of the main terminal connection block. Polarity is unimportant. 3. An appropriate strain relief for service cord or conduit MUST be attached to the conduit plate. ACCEPTABLE - 3 WIRE PLUG INSTALLATION WH BLACK-_\ \ GROUND STRAF (CONNECTED AT FACTORY) MAIN TERMINAL CONNECTION BLOCK IDDLE WIRE OF SERVICE CORD OR GROUND LEAD OF CONDUIT. CONDUIT _,__"1 /--STAMPED _%_'Sj_,,'_"IL/" CONDUIT STRAIN RELIEF PLATE __ i/ v STAMPED _/ CORD _ FOR USE WITH CONDUIT, REMOVE BRACKET, FLIP & RE-ATTACH WITH HOLE MARKED "CONDUIT" DOWN. Z OUT_ MOUNTED FLUSH TO WALL OUTLET RECEPTACLE TO BE ROTATED AS SHOWN IF NOT FLUSH TO WALL ALTERNATE INSTALLATION FIGURE 6 -6-