URC TKP-7600 Owners Manual - Page 6
Parts List, Installing the TKP-7600
View all URC TKP-7600 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
Parts List Included in the TKP-7600 1x - TKP-7600 Network Keypad 4x - Mounting Screws 1x - Mounting Ring 4x - Spacers TKP-7600 Mounting Ring Spacers Mounting Screws Installing the TKP-7600 The TKP-7600 is wall-mountable and fits into a standard dual gang (J-box or Mud Ring) opening. Prior to installation, make sure power is available at the preferred location. Power can be supplied to the TKP-7600 through an Ethernet (RJ45) cable connected to a PoE (power over Ethernet) or in either of the following ways: ● Router/Switch ● PoE injector Power over Ethernet or PoE technology describes a system to pass electrical power safely, along with data, on Ethernet cabling. A shielded Ethernet cable is preferred. The IEEE standard for PoE requires a Category 5 or higher for high power levels. Use the spacers when installing the mount ring on to a gang box, the spacers are not needed when using a p-ring. Instructions for mounting the TKP-7600 on the wall can be found on the following page. Page 3