HP XP P9500 HP StorageWorks P9000 for Business Continuity Manager Software Ref - Page 297
Msgdemo_msg. Flush, Gotoswapping Timeout10
View all HP XP P9500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 297 highlights
end end "from planned outage configuration." /* * Confirm that the status of the MYTCHS copy pair is one where a * DeltaResync can be performed. */ address TSO "YKEWAIT STEM(DEMO_INFO.MYTCHS.) MSG(DEMO_MSG.)", "GOTO(SWAPPING) TIMEOUT(10)" /* * Check the return code of YKEWAIT. */ if rc /= 0 then do call printErrorMessage exit end else nop /* * Suspend the MYUR2 copy pair to change the status of MYUR2 * to one where a DeltaResync can be performed. */ address TSO "YKSUSPND STEM(DEMO_INFO.MYUR2.)", "MSG(DEMO_MSG.) FLUSH" /* * Check the return code of YKSUSPND. */ if rc /= 0 then do call printErrorMessage exit end else nop /* * Confirm that the status of the MYUR2 copy pair is one where a * DeltaResync can be performed. */ address TSO "YKEWAIT STEM(DEMO_INFO.MYUR2.) MSG(DEMO_MSG.)", "GOTO(SUSPEND) TIMEOUT(10)" /* * Check the return code of YKEWAIT. */ if rc /= 0 then do call printErrorMessage exit end else nop /* * Execute a DeltaResync on the MYUR1 copy pair to change * the status of MYUR1 to DUPLEX, and to change Command details 297