Insulating the Refrigerant Tubing
![]() |
View all Panasonic WU-144MF1U9E manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 56 highlights
5. HOW TO PROCESS TUBING 5-3. Insulating the Refrigerant Tubing Tubing Insulation Thermal insulation must be applied to all unit tubing, including the distribution joint (purchased separately). (Fig. 2-25) * For gas tubing, the insulation material must be heat resistant to 248°F or above. For other tubing, it must be heat resistant to 176°F or above. Insulation material thickness must be 25/64 in. or greater. If the conditions inside the ceiling exceed DB 86°F and RH 70%, increase the thickness of the gas tubing insulation material by 1 step. If the exterior of the outdoor CAUTION unit valves has been finished 1 with a square duct covering, make sure you allow sufficient space to use the valves and to allow the panels to be attached and 2 removed. Taping the flare nuts Wind the white insulation tape around the flare nuts at the gas tube connections. Then cover up the tubing 3 connections with the flare insulator, and fill the gap at the union with the supplied black insulation tape. Finally, fasten the insulator at both ends with the supplied vinyl clamps. (Fig. 2-26) 4 5 Design of 3WAY VRF SYSTEM Two tubes arranged together Liquid tubing Gas tubing Insulation Three tubes arranged together Cosmetic (finishing) tape Liquid tubing Gas tubing Insulation Balance tubing Four tubes arranged together Cosmetic (finishing) tape Suction tubing Discharge tubing Balance tubing Insulation Liquid tubing Fig. 2-25 Sealer (supplied) Insulation tape (white) (supplied) Flare insulator (supplied) Unit side insulator Tube insulator (not supplied) Heat resistant 248°F or above Flare nut Vinyl clamps (supplied) Fig. 2-26 6 7 8 2 - 42
![](/manual_guide/products/panasonic-u72mf1u9-technical-service-data-fe993b9/56.png)