Invacare RPL600-2 Owners Manual - Page 18

Installing the Leg Actuator to the Base, DETAIL A - SIDE VIEW OF PATIENT LIFT, DETAIL B

Page 18 highlights

5 ASSEMBLY 5.5 Installing the Leg Actuator to the Base 1. Slide the leg actuator into the slot in the base of the patient lift (Detail B). 2. Perform the following to secure the leg actuator to the pivot bracket (Detail A): ƽ WARNING Ensure that there is sufficient room to turn patient lift on its side and that floor area is clear of debris. Otherwise, injury to personnel or damage to patient lift may occur. A. Turn the patient lift on its side. B. Position slot in leg actuator over the pivot bracket. C. Install the pin through the leg actuator and pivot bracket and secure with hitch pin. D. Return the patient lift to the upright position. 3. Perform the following to secure the leg actuator to the mast bracket: A. Position leg actuator between mast brackets. B. Move the legs to align the holes in the leg actuator with the holes in the mast bracket. C. Install the pin through the holes of the leg actuator and mast bracket and secure with hitch pin. 4. Plug the pendant control (not shown) into the bottom of the control box. DETAIL "A" - SIDE VIEW OF PATIENT LIFT Pivot Base Leg Bracket % Hitch Pin DETAIL "B" Hitch Pin Boom Assembly Battery Control Box Mast Bracket Pin Leg Actuator Pin Boom Actuator Mast Leg Actuator Slot in Base Electric Portable Patient Lift 18 Part No. 1145810

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52

5 ASSEMBLY
Electric Portable Patient Lift
18
Part No. 1145810
5.5
Installing the Leg Actuator to the Base
1.
Slide the leg actuator into the slot in the base of the patient lift
(Detail B).
2.
Perform the following to secure the leg actuator to the pivot
bracket (Detail A):
A.
Turn the patient lift on its side.
B.
Position slot in leg actuator over the pivot bracket.
C.
Install the pin through the leg actuator and pivot bracket and
secure with hitch pin.
D.
Return the patient lift to the upright position.
3.
Perform the following to secure the leg actuator to the mast
bracket:
A.
Position leg actuator between mast brackets.
B.
Move the legs to align the holes in the leg actuator with the
holes in the mast bracket.
C.
Install the pin through the holes of the leg actuator and mast
bracket and secure with hitch pin.
4.
Plug the pendant control (not shown) into the bottom of the
control box.
±
WARNING
Ensure that there is sufficient room to turn patient lift
on its side and that floor area is clear of debris.
Otherwise, injury to personnel or damage to patient lift
may occur.
DETAIL “A” - SIDE VIEW OF PATIENT LIFT
Pin
Pivot
Bracket
Leg
Actuator
±
Base
Leg
Mast Bracket
Pin
Boom Assembly
Leg Actuator
Boom Actuator
Slot in Base
Mast
Battery
Hitch Pin
Control Box
DETAIL “B”
Hitch
Pin