Pyle SLPPTB22 Instruction Manual - Page 5

Step 2

Page 5 highlights

STEP 2 Hardware Needed: H4 Bolt M8x60MM 4.PCS H7 M8 Lock nut 4.PCS H14 M8 Washer 8.PCS P2 Caster Beams 2.PCS P3 M10 Lock nut 8.PCS • Attach Middle Plate (P3) to Caster Beams (P2) as shown in the above image. • Thread the Bolt (H4) through the Washer (H14), both Steel Frames, another Washer (H14) and secure with Lock Nut (H7). • Repeat for both Caster Beams then tighten completely. www.SereneLifeHome.com 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18

www.SereneLifeHome.com
5
STEP 2
Hardware Needed:
• Attach Middle Plate (P3) to Caster Beams (P2) as shown in the above image.
• Thread the Bolt (H4) through the Washer (H14), both Steel Frames, another
Washer (H14) and secure with Lock Nut (H7).
• Repeat for both Caster Beams then tighten completely.
H4
P3
H7
H14
P2
M8 Lock nut 4.PCS
Bolt M8x60MM 4.PCS
M10 Lock nut 8.PCS
Caster Beams 2.PCS
M8 Washer 8.PCS