Panasonic WU-144MF1U9E ECOi/VRF Systems Indoor Unit Installation Manual - Page 36
See 5. HOW TO PROCESS TUBING, 3-32. Installing the Drain Piping and 4. ELECTRICAL WIRING.
![]() |
View all Panasonic WU-144MF1U9E manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 36 highlights
3-28. Preparations Before Installation (1) Confirm the positional relationship between the unit and suspension bolts. (Refer to the diagram.) • Install the inspection opening on the control box side where maintenance and inspection of the control box are easy. The drain pump can only be inspected through the bottom of the unit. Install the inspection opening also in the lower part of the unit. Air discharge Air intake (Inspection access) 2.3 Arrow view A Inspection access (Field supply) 2.7 A Ceiling Fig. 3-104 Unit: ft. (2) Make sure the range of the unit's external static pressure is not exceeded. (See the technical documentation for the range of the external static pressure setting.) (3) Open the installation hole. (Pre-set ceilings) • Once the installation hole is opened in the ceiling where the unit is to be installed, pass refrigerant piping, drain piping, transmission wiring, and remote control wiring (It is not necessary if using a wireless remote controller) to the unit's piping and wiring holes. See "5. HOW TO PROCESS TUBING, 3-32. Installing the Drain Piping" and "4. ELECTRICAL WIRING". • After opening the ceiling hole, make sure ceiling is level if needed. It might be necessary to reinforce the ceiling frame to prevent shaking. Consult an architect or carpenter for details. 3-29. For Bottom Intake For bottom intake, replace the chamber lid and protection net in the procedure shown in the diagram. (1) Remove the Frame Filter Assy. Remove the chamber lid. (2) Refer to the diagram to attach the chamber lid and Frame Filter Assy in the direction of the arrow. Note: Attach the lid with the dummy holes downward. (3) Attach the Frame Filter Assy (supplied) in the manner shown in the diagram. (1) Air intake (3) Main unit Frame Filter Assy Chamber lid Frame Filter Assy Attach the Frame Filter Assy to the main unit while pushing the tip of the latches in the direction of the arrow. Air discharge Dummy hole (2) Dummy hole Chamber lid Air discharge Air intake Frame Filter Assy In case of bottom side In case of back side Fig. 3-105 36 73'@*OEPPS@64JOEC
![](/manual_guide/products/panasonic-s07md1u6-ecoivrf-systems-indoor-unit-installation-manual-eca925b/36.png)