Netgear XCM89UP Hardware Installation Guide - Page 39
Install an M6100 switch blade
View all Netgear XCM89UP manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 39 highlights
M6100 - Campus Edge and SMB Core Chassis Switch, Blades, and Daughter Cards Install an M6100 switch blade You need the following tools and equipment to install an M6100 switch blade: • No. 2 Phillips screwdriver • Appropriate type of cable for any ports on the module To install a switch blade in an M6100 series chassis switch: 1. Select a slot for the switch blade. 2. Remove a blank front panel from the chassis slot, if necessary. A blank faceplate must be installed in any unoccupied switch blade slot in the chassis to ensure satisfactory protection from EMI and to maintain adequate airflow through the chassis. 3. Remove the switch blade from the antistatic packaging. CAUTION: To prevent ESD damage, hold the switch blade by the metal rail and front panel only. Never touch the components on the PCB or the pins on any of the connectors. 4. Verify that the switch blade injector/ejector handles are open. 5. Keep the injector/ejector handles in the open position as you slide the switch blade into the chassis slot. CAUTION: Do not slide the switch blade into the open chassis slot if the injector/ejector handles are in the latched position. Install M6100 Switch Blades 39 M6100 Hardware Installation Guide