LiftMaster SL585151U SL585151U Installation Manual - Page 21

Three Phase, Power Wiring

Page 21 highlights

INSTALLATION STEP 5 (continued) POWER WIRING THREE PHASE The operator is field configurable for usage at 208, 240, and 480 Vac. Factory default is 240 Vac. For three phase 575V operators, the operator is configured at the factory for 575V ONLY. For 208 Vac Operation Ensure the motor harness is plugged in to the "208V / 240V" receptacle on the power board. Swap the orange and red transformer wires (the red wire connects to the 240V position and the orange wire connects to the 208V position). For 480 Vac Operation Unplug the motor power harness from the"208V / 240V" receptacle on the power board and plug the harness into the "480V" receptacle. 1. Make sure the AC power switch on the operator is OFF (the AC power switch will turn the incoming power ON or OFF). 2. Turn off the AC power from the main power source circuit breaker. 3. Run the AC power wires to the junction box on the operator. 4. Remove the junction box cover. 5. Connect the operator wires to line power via the white, black, purple and, green wires in the junction box. Follow the table in the specification section for the appropriate wire gauge for your application. 6. Replace the junction box cover. Ensure the wires are not pinched. 7. Turn on the AC power from the main power source circuit breaker. 8. Turn on the AC power switch. NOTE: To use a heater with the 480V configuration an additional step down transformer is required. THREE PHASE OPERATOR THREE PHASE POWER BOARD J9 J12 MOTOR CURRENT J14 (BLACK) L1 J1 (WHITE) L2 J2 (PURPLE) L3 J3 LINE IN J4 TRANSFORMER 240/575V 208V ORANGE RED PURPLE WHITE COMM BRAKE J10 J13 J5 480V J6 J11 J8 J7 Red and orange transformer wires Receptacles 480V 240V/208V 575V AC Power Switch Motor Harness Purple White Black Green INCOMING POWER 19 JUNCTION BOX

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52

19
THREE PHASE
STEP 5 (continued)
POWER WIRING
INSTALLATION
The operator is field configurable for usage at 208, 240, and 480 Vac. Factory default is 240 Vac. For three phase 575V operators, the operator is
configured at the factory for 575V ONLY.
For 208 Vac Operation
Ensure the motor harness is plugged in to the “208V / 240V” receptacle on the power board. Swap the orange and red
transformer wires (the red wire connects to the 240V position and the orange wire connects to the 208V position).
For 480 Vac Operation
Unplug the motor power harness from the“208V / 240V” receptacle on the power board and plug the harness into the
“480V” receptacle.
1. Make sure the AC power switch on the operator is OFF (the AC power switch will turn the incoming power ON or OFF).
2. Turn off the AC power from the main power source circuit breaker.
3. Run the AC power wires to the junction box on the operator.
4. Remove the junction box cover.
5.
Connect the operator wires to line power via the white, black, purple and, green wires in the junction box. Follow the table in the specification
section for the appropriate wire gauge for your application.
6. Replace the junction box cover. Ensure the wires are not pinched.
7. Turn on the AC power from the main power source circuit breaker.
8. Turn on the AC power switch.
NOTE:
To use a heater with the 480V configuration an additional step down transformer is required.
TRANSFORMER
J14
J11
J12
LINE IN
J1
L1
J2
L2
J3
L3
J7
COMM
WHITE
(BLACK)
(WHITE)
(PURPLE)
208V
RED
240/575V
ORANGE
480V
PURPLE
J9
J5
J4
J6
MOTOR
CURRENT
480V
240V/208V
575V
J8
BRAKE
J10
J13
JUNCTION BOX
Motor Harness
THREE PHASE POWER BOARD
Receptacles
Red and orange
transformer wires
INCOMING POWER
White
Black
Green
THREE PHASE OPERATOR
Purple
AC Power Switch