HP R8000/3 UPS R6000 ERM Installation Instructions - Page 2
Checking the Battery, Recharge Date, Kit Contents, Tools and Materials Required, Preparing
View all HP R8000/3 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 2 highlights
Checking the Battery Recharge Date Before unpacking the ERM, check the battery recharge date specified on the battery recharge date label that is affixed to the shipping carton. IMPORTANT: Do not use the battery if the recharge date has passed. If the date on the battery recharge date label has passed without the battery being recharged, contact an HP authorized service representative for directions. NOTE: The following label is only an example date. The date on your carton may be different. Kit Contents Documentation • Important Safety Information guide • International Regulatory Compliance guide • This document Rails • Rails, with mounting hardware • Rack template tool 3U (347218-022) ERM • ERM chassis • Battery packs (2) • Front bezel Additional Hardware The following items are supplied for shipping a rack with a UPS installed: • M6 nuts (4) • M6 flat washers (4) • M6 split washers (4) Cables • ERM power cable (attached to unit) Tools and Materials Required The following tools are required: • #2 Phillips screwdriver The following items are supplied with the rack: • Screws • Cage nuts • Cage nut-fitting tool Preparing for Installation Powering Down the UPS To power down the UPS: 1. Shut down all load devices. 2. Press the Standby button to take the UPS out of Operate mode. Power to the load receptacles ceases. 3. Disconnect the UPS from utility power. 4. Wait at least 60 seconds while the UPS internal circuitry discharges. Unpacking the ERM Transport the packaged ERM to its installation location. Unpack the ERM near the rack where it will be assembled, following the instructions on the carton. Verify that all components are present. WARNING: The battery packs are charged from the factory. To prevent personal injury from electric shock, do not touch the metal contacts inside the connector. Mounting the Rails The ERM must be mounted on the fixed rails supplied with the unit. Before beginning this installation process, review and adhere to the following precautions. WARNING: To prevent personal injury, verify that the rack containing the ERM is stable. The following conditions must be met: • The leveling feet are extended to the floor. • The full weight of the rack rests on the leveling feet. • The stabilizing feet are attached to the rack if it is a single-rack installation. • The racks are coupled together if it is a multi-rack installation. • Only one component should be extended at a time. A rack may become unstable if more than one component is extended for any reason.