Haier HPU-36CA03T3 Operation Manual - Page 27

valve,then

Page 27 highlights

■ Installation procedures 3. Piping connection of outdoor unit. Connect the connecting pipe and inlet and outlet liquid pipe according to the piping method. 4.Purging method Discharge the air out of the indoor unit and the refrigerant pipe by vacuumizing (1) Fasten all the nuts of the indoor and outdoor pipes to make these parts out of leakage. (2) Under the condition of the complete close of the indoor and outdoor valve center (both liquid and gas side),dismount the repair valve cap.Vacuumizing through the charge mouth of the repair valve. (3) After vacuumizing fasten the repair valve,and dismount the cap of the big and small stop valve,then loosen the stop valve center completely and fasten the big and small stop valve. 5.Extra charging amount of the refrigerant When piping is longer than 5 m, charge additional refrigerant specified in this list. Pipe length 5m 10m 15m Refrigerant charge (g) 325 650 20m 975 25m 1300 30m 1625 25

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

Installation
procedures
3.
Piping
connection
of
outdoor
unit.
Connect
the
connecting
pipe
and
inlet
and
outlet
liquid
pipe
according
to
the
piping
method.
4.Purging
method
Discharge
the
air
out
of
the
indoor
unit
and
the
refrigerant
pipe
by
vacuumizing
(1)
Fasten
all
the
nuts
of
the
indoor
and
outdoor
pipes
to
make
these
parts
out
of
leakage.
(2)
Under
the
condition
of
the
complete
close
of
the
indoor
and
outdoor
valve
center
(both
liquid
and
gas
side),dismount
the
repair
valve
cap.Vacuumizing
through
the
charge
mouth
of
the
repair
valve.
(3)
After
vacuumizing
fasten
the
repair
valve,and
dismount
the
cap
of
the
big
and
small
stop
valve,then
loosen
the
stop
valve
center
completely
and
fasten
the
big
and
small
stop
valve.
5.Extra
charging
amount
of
the
refrigerant
When
piping
is
longer
than
5
m,
charge
additional
refrigerant
specified
in
this
list.
Pipe
length
5m
10m
15m
20m
25m
30m
Refrigerant
charge
(g)
325
650
975
1300
1625
25