GE PV970NSS Use and Care Manual - Page 14

Installation Instructions, INSTALLATION-VENTED TO THE OUTSIDE

Page 14 highlights

Installation Instructions INSTALLATION-VENTED TO THE OUTSIDE DUCTWORK, WIRING LOCATIONS Determine the exact location of the vent hood. • Locate the template packed with the literature. - Measure 36" from the floor to the top of the cooking surface. Add hood installation height determined on pages 8 and 13. Mark that location. - Use a level to draw a straight pencil line on the wall. - Tape the template in position along the penciled line. CHECK TO BE SURE THE TEMPLATE IS LEVEL. 5" centerline to wall Ceiling House Wiring Location 5" CL WALL VENT IS 27-3/4" MIN. ABOVE THE INSTALLATION HEIGHT DRILL 2 (TWO) 3/16" PILOT HOLES THROUGH STUDS OR REAR WALL SUPPORT 10-1/8" Wall vent 27-3/4" min. above installation height Vertical Centerline 18" Min. 11-7/16" 2" REAR WALL MOUNTING TEMPLATE CL DRILL 2 (TWO) 3/16" PILOT HOLES THROUGH STUDS OR REAR WALL SUPPORT Horizontal Line 12-1/2" Installation Height ALIGN BOTTOM EDGE WITH PENCIL LINE INDICATING BOTTOM OF THE HOOD 31-14772 Printed in Mexico 12-08 JR Ceiling ducting: If ductwork will vent straight up to the ceiling: • Use a level to draw a line straight up, from the centerline on the template to the ceiling. • Measure 5" from the back wall to the centerline of an 8-1/2" hole on the ceiling. NOTE: If drywall is not present, add drywall thickness to the 5" dimension. Wall Ducting: If ductwork will vent to the rear: • Use a level to draw a line straight up from the centerline on the template. • Measure at least 27-3/4" above the pencil line that indicates the bottom installation height, to the centerline of an 8-1/2" dia. duct hole. (Hole may be elongated for duct elbow.) HOUSE WIRING LOCATION: • The junction box is located on the top left side of the hood. • Wiring should enter the back wall at least 18" above the bottom of the hood and within 5" of the left side of the centerline. 1 INSTALL FRAMING FOR HOOD SUPPORT IMPORTANT - Framing must be capable of supporting 100 lbs. 8-1/2" min. opening for ductwork View from rear cleats 1" x 12" min. mounting support Centerline of installation space If drywall is present, mark the screw hole locations for the top mounting brackets. Remove the template. • Cut away enough drywall to expose 2 vertical studs at the bracket location indicated on the template. • Install a horizontal support at least 1" x 12" between two wall studs at the mounting screw location. The horizontal support must be flush with the room side of the studs. Use cleats behind both sides of the support to secure to wall studs. NOTE: 2 horizontal supports will be needed if there is a stud located between the horizontal screw locations (see figure). IMPORTANT: Reinstall drywall for an even mounting surface. 14

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52

14
INSTALL FRAMING
FOR HOOD SUPPORT
IMPORTANT
Framing must be capable
of supporting 100 lbs.
If drywall is present, mark the screw hole locations
for the top mounting brackets. Remove the template.
Cut away enough drywall to expose 2 vertical studs
at the bracket location indicated on the template.
Install a horizontal support at least 1" x 12"
between two wall studs at the mounting screw
location.
The horizontal support must be flush with
the room side of the studs.
Use cleats behind both
sides of the support to secure to wall studs.
NOTE:
2 horizontal supports will be needed if there
is a stud located between the horizontal screw
locations (see figure).
IMPORTANT:
Reinstall drywall for an even mounting
surface.
1
Installation Instructions
Centerline of
installation
space
View from
rear cleats
1" x 12" min.
mounting
support
DUCTWORK, WIRING LOCATIONS
Determine the exact location of the vent hood.
Locate the template packed with the literature.
– Measure 36" from the floor to the top of the cooking
surface. Add hood installation height determined on
pages 8 and 13. Mark that location.
Use a level to draw a straight pencil line on the wall.
– Tape the template in position along the penciled
line. CHECK TO BE SURE THE TEMPLATE IS LEVEL.
Ceiling ducting:
If ductwork will vent straight up to the ceiling:
Use a level to draw a line straight up, from
the centerline on the template to the ceiling.
Measure 5" from the back wall to the centerline
of an 8-1/2" hole on the ceiling.
NOTE:
If drywall is not present, add drywall thickness
to the 5" dimension.
Wall Ducting:
If ductwork will vent to the rear:
Use a level to draw a line straight up from
the centerline on the template.
Measure at least 27-3/4" above the pencil line
that indicates the bottom installation height,
to the centerline of an 8-1/2" dia. duct hole.
(Hole may be elongated for duct elbow.)
HOUSE WIRING LOCATION:
The junction box is located on the top left side
of the hood.
Wiring should enter the back wall at least 18" above
the bottom of the hood and within 5" of the left side
of the centerline.
INSTALLATION—VENTED TO THE OUTSIDE
8-1/2" min. opening for ductwork
REAR WALL
MOUNTING TEMPLATE
Vertical Centerline
ALIGN BOTTOM EDGE
WITH PENCIL LINE
INDICATING BOTTOM
OF THE HOOD
11-7/16"
Installation Height
Horizontal Line
C
L
DRILL 2 (TWO) 3/16" PILOT HOLES THROUGH STUDS OR REAR WALL SUPPORT
10-1/8"
12-08 JR
2"
DRILL 2 (TWO) 3/16" PILOT HOLES THROUGH STUDS OR REAR WALL SUPPORT
12-1/2"
WALL VENT IS 27-3/4" MIN.
ABOVE THE INSTALLATION
HEIGHT
31-14772 Printed in Mexico
Ceiling
House Wiring
Location
C
L
5"
18"
Min.
Wall vent
27-3/4" min.
above
installation
height
5" centerline to wall