GE JVX3240DJWW Use and Care Manual - Page 12
Remove The Packaging, Tools And Materials, Required, Plan The Installation, Parts Supplied For,
![]() |
View all GE JVX3240DJWW manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 12 highlights
INSTALLATION PREPARATION Installation Preparation TOOLS AND MATERIALS REQUIRED (NOT SUPPLIED) Pencil and tape measure Safety glasses Spirit level :LUHFXWWHUVWULSSHU Electric drill, #2 Phillips, flat head, and 9»32" drill bit UL listed wire nuts Torx 10, 15, 20 driver Strain relief for junction box Charcoal Filter (required for some models in recirculation mode) Aluminized Duct tape PLAN THE INSTALLATION CAUTION To reduce risk of fire and to properly exhaust air, be sure to duct the air outside - Do not vent exhaust air into spaces within walls or ceilings or into attics, crawl spaces, or garages. PARTS SUPPLIED FOR INSTALLATION • 1 Hardware Package • 1 Literature Package • 1 Vented Mode Deflector Part PARTS NEEDED FOR INSTALLATION • 1 Strain Relief • Power Supply Cable • 1 Wall or Roof Cap (for external venting only) • All Metal Ductwork (for external venting only) NOTE: This range hood can be installed as either ducted or recirculation. In a ducted application, this range hood can be vented through the wall or ceiling. When installed for recirculation, the range hood vents out the front of the hood. NOTE: Before making any cuts or holes for installation, determine which venting method will be used and carefully calculate all measurements. REMOVE THE PACKAGING CAUTION Wear gloves to protect against sharp edges. • Remove the hardware bag, literature package and other boxed parts. • Remove and properly discard the protective plastic wrapping and other packaging materials. 12 49-80783-3
![](/manual_guide/products/general-electric-pvx7360sjss-use-care-manual-ecb9904/12.png)