Dell U4323QE UltraSharp 43 4K USB-C Hub Monitor - Simplified Service Manual - Page 9

No.2~8 screw size=M3x7.5, Torque=6, kgfxcm, No.1 screw size=M4x8, Torque=6, kgfxcm, No.1~2 Screw

Page 9 highlights

5. Disassembly and Assembly Procedures Tear off 4pcs rubbers , then use a Philips-head screwdriver to remove 2pcs screws for unlocking the small bracket with T-Con board, then remove the S13 small bracket, then release the LED key cable by tearing off tapes on the back of the cable. (No.1~2 Screw size= M3x0.5x4, Torque=3~5kgfxcm) Use a Philips-head screwdriver to remove 9pcs screws for unlocking power board and interface S16 board with the bracket. (No.1 screw size=M4x8, Torque=6±0.5kgfxcm; No.2~8 screw size=M3x7.5, Torque=6±0.5kgfxcm) 8 4 2 6 2 1 Lift up the middle frame and put it into a fixture, tear S14 off the maylar tape for releasing the LED key board away from the middle frame. 7 5 1 3 Remove the circuit boards from the bracket S17 chassis module carefully, and then disconnect all of the cables. Remove 2pcs shading tape on the left and right side S15 of the panel corner, then remove 27pcs acetate tapes on the specific positions of the back of panel.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21

5. Disassembly and Assembly Procedures
No.2~8 screw size=M3x7.5, Torque=6
±0.5
kgfxcm)
Use a Philips-head screwdriver to remove
9pcs
screws for unlocking power board and interface
board with the bracket.
(No.1 screw size=M4x8, Torque=6
±0.5
kgfxcm;
Remove the circuit boards from the
bracket
chassis module carefully, and then
disconnect all
of the cables.
S16
S17
5
7
6
8
2
4
1
3
(No.1~2 Screw size= M3x0.5x4, Torque=3
~5
kgfxcm)
Tear off 4pcs rubbers , then use
a Philips-head
screwdriver to remove 2pcs screws for unlocking the
small bracket with T-Con board, then remove the
small bracket, then release the LED key cable by
tearing off tapes on the back of the cable.
S13
Lift up the middle frame and put it into a fixture, tear
off the maylar tape for releasing the LED key board
away from the middle frame.
S14
1
2
Remove 2pcs shading tape on the left and right side
of the panel corner, then remove 27pcs acetate
tapes on the specific positions of the back of panel.
S15