Dell PowerStore 3000X EMC PowerStore Power Down and Reboot Procedures Guide - Page 6
Power control procedures preview
![]() |
View all Dell PowerStore 3000X manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
Power control procedures preview The following table provides a preview of the steps that are required to power off or up the relevant component in your cluster: Table 1. Power control procedures preview Component Node Action Power off PowerStore T model Use PowerStore Manager. Or Run a service script. PowerStore X model Use VMware vCenter server. Appliance Cluster Power on Reboot Power off Power on Power off Power on • If the node was removed • If the node was removed from the chassis, reseat the from the chassis, reseat the node into the chassis, and node into the chassis, reconnect its power cable. reconnect its power cable, • If the node was not removed and use VMware vCenter from the chassis, run a server. service script. • If the node was not removed from the chassis, run a service script and use VMware vCenter server. Use PowerStore Manager. Or Run a service script. Use VMware vCenter server. Run a service script. Use VMware vCenter server. If the nodes or expansion If the nodes or expansion enclosures were removed from enclosures were removed from the chassis, reseat the the chassis, reseat the expansion enclosures and nodes. expansion enclosures and nodes. Reconnect power cables in the Reconnect power cables in the right order. right order, and use VMware vCenter server. Use PowerStore Manager. Or Run a service script. Use VMware vCenter server. If the nodes or expansion If the nodes or expansion enclosures were removed from enclosures were removed from the chassis, reseat the the chassis, reseat the expansion enclosures and nodes. expansion enclosures and nodes. Reconnect power cables in the Reconnect power cables in the right order. right order, and use VMware vCenter server. 6 Introduction
![](/manual_guide/products/dell-powerstore-1000t-emc-powerstore-power-reboot-procedures-guide-088b5cb/6.png)