D-Link DES-7210-BASE Quick Installation Guide - Page 5
Installation Site Requirements
![]() |
View all D-Link DES-7210-BASE manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
Requirements of Installation Tools Type Tools Claw hammer, pliers Common Tools Phillips-head screwdriver, straight screwdriver, spanner Power supply cables, network cables, optical ſDGTUCPFFKUVTKbution cables Ruler, long tapeline, marker pen Bolts, diagonal pliers, straps Specialpurpose Tools Anti-static tool Wire stripper, crimping pliers Multimeter Meter 500V megohmmeter Remarks Unpack wooden case and transportation case. Disassemble chassis, power supply, fan and modules. Connect the interfaces. Measure the installation position. Mount the chassis. Prevent static electricity. Create network cables and grounding cables. Test power supply and DC resistance. Test the insulation resistance and grounding resistance. Table 3. Required Tools Installation Site Requirements The DES-7200 must be used indoors. To ensure the normal operation and prolonged WUGHWNſNGQHVJGGSWKROGPVVJGKPUVCNNCVKQPUKVG must meet the following requirements. Requirements for Rack Mounting +H[QWRNCPVQOQWPVVJG&'5KPCHTCOG please observe the following guidelines: - +PUVCNNVJGUYKVEJKPCPQRGPECDKPGVKH RQUUKDNG+H[QWKPUVCNNVJGUYKVEJKPUKFG a closed cabinet, please ensure that the cabinet has a good ventilation and heat dissipation system. - Ensure that the cabinet is durable enough to bear the weight of the DES-7200 and its installation accessories. - Ensure that the dimensions of the cabinet provide enough space for the installation of the front, rear, left and right panels of the DES-7200 for the sake of heat dissipation. - The frame should be properly grounded. Ventilation Requirements (QNNQYKPIſIWTGUJQYUVJGXGPVKNCVKQP requirements of the DES-7200. You must TGUGTXGUWHſEKGPVURCEKPIPGCTVJGXGPVUVQ ensure proper ventilation. After the cables have been connected, they should be arranged into bundles or placed on the cabling rack, to prevent the obstruction of air inlets and vents. Figure 3. Ventilation of the DES-7200 Mounting the DES-7200 into the Cabinet 1. With a person on each side of the DES-7200, lift the chassis while keeping it level. Slowly move it to the front of the frame. 2. Keeping the DES-7200 level, lift it to a position slightly higher than the tray or the slide rail of the cabinet. Set the chassis onto the tray or the slide rail, and push it into the cabinet. 3. Fasten the DES-7200 to the cabinet with screws. Fastening notches are on both the left and right side of the front panel on the equipment frame. Use screws to fasten them to the bracket of the cabinet. Once fastened, the equipment should be stable and immobile. 6/10 Slot Chassis-Based Switch 5
![](/manual_guide/products/dlink-des7210base-quick-installation-guide-49fca78/5.png)