2011 Yamaha Motorsports Apex SE Owners Manual - Page 69

2011 Yamaha Motorsports Apex SE Manual

Page 69 highlights

Periodic maintenance and adjustment 3. Rotate the secondary sliding sheave clockwise and push it so that it separates from the secondary fixed sheave. 2 1. Secondary sliding sheave 2. Secondary fixed sheave 1 4. Pull the V-belt up over the secondary fixed sheave. 1. Edge of the secondary sheave assembly 2. Standard V-belt position Standard V-belt position: From 1.5 mm (0.06 in) above the edge of the secondary sheave assembly to 0.5 mm (0.02 in) below the edge 1. V-belt 5. 6. Remove the V-belt from the secondary sheave assembly and primary sheave assembly. Temporarily install the new V-belt on the secondary sheave assembly only, and then measure the V-belt position. Do not force the V-belt between the sheaves; the secondary sliding and fixed sheaves must touch each other. 7. If the V-belt position is incorrect, adjust it by removing or adding a spacer on each V-belt position adjusting bolt. 63

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106

Periodic maintenance and adjustment
63
3.
Rotate the secondary sliding sheave
clockwise and push it so that it separates
from the secondary fixed sheave.
4.
Pull the V-belt up over the secondary
fixed sheave.
5.
Remove the V-belt from the secondary
sheave assembly and primary sheave
assembly.
6.
Temporarily install the new V-belt on the
secondary sheave assembly only, and
then measure the V-belt position. Do not
force the V-belt between the sheaves; the
secondary sliding and fixed sheaves
must touch each other.
7.
If the V-belt position is incorrect, adjust it
by removing or adding a spacer on each
V-belt position adjusting bolt.
1.
Secondary sliding sheave
2.
Secondary fixed sheave
1. V-belt
1.
Edge of the secondary sheave assembly
2.
Standard V-belt position
Standard V-belt position:
From 1.5 mm (0.06 in) above the
edge of the secondary sheave as-
sembly to 0.5 mm (0.02 in) below the
edge
2
1