Viking VCBB363RSS Installation Instructions - Page 24

Performance Checklist - icemaker

Page 24 highlights

Final Installation 28 29 Performance Checklist Replace top air grille. 30a Using an 8" magnetic nut driver, replace the two 1/4" screws. 30b (Professional) Replace the center grille louver. 31 (Designer) Replace the center grille louver. 32 Open door. Display should flash. Press "ACTIVATE CONTROLS" pad and close door. NOTE: There is a 6 minute delay before the unit starts. 46 h Verify cabinet size. h Verify electrical supply and water supply (if applicable). h Install anti-tip device(s) and verify unit is secure. h Position unit in cutout, level at desired height and secure unit. h Plug-in unit and verify operation. h Connect water supply (if applicable). • Verify icemaker fill tube is properly inserted. • Verify icemaker bail arm is down. • Verify dispenser operation (if applicable). h Align/square door(s). h Verify drain pan is properly installed and no leaks on water connection. h Install kickplate. h Remove internal packaging and labels and wipe unit down. Installer's information: Installer's name Installer's company Date 47

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26

47
46
Replace top air grille.
Using an 8” magnetic nut driver, replace
the two 1/4” screws.
(Professional) Replace the center grille louver.
(Designer) Replace the center grille louver.
Open door. Display should flash.
Press “ACTIVATE CONTROLS” pad and close door.
NOTE:
There is a 6 minute delay before the unit starts.
28
29
30a
30b
31
32
Final Installation
Performance Checklist
h
Verify cabinet size.
h
Verify electrical supply and water supply
(if applicable).
h
Install anti-tip device(s) and verify unit is
secure.
h
Position unit in cutout, level at desired
height and secure unit.
h
Plug-in unit and verify operation.
h
Connect water supply (if applicable).
• Verify icemaker fill tube is properly
inserted.
• Verify icemaker bail arm is down.
• Verify dispenser operation
(if applicable).
h
Align/square door(s).
h
Verify drain pan is properly installed and
no leaks on water connection.
h
Install kickplate.
h
Remove internal packaging and labels
and wipe unit down.
Installer’s information:
Installer’s name:
_____________________________
Installer’s company:
_________________________
Date:
________________________________________