Viking FDRB5303R Installation Instructions - Page 44

Performance Checklist

Page 44 highlights

Performance Checklist Verify cabinet size. Verify electrical supply and water supply (if applicable). Install anti-tip device(s) and verify unit is secure. Position unit in cutout, level at desired height and secure unit. Plug-in unit and verify operation. Connect water supply (if applicable). • Verify icemaker fill tube is properly inserted. • Verify icemaker bail arm is down. • Verify dispenser operation (if applicable). Align/square door(s). Verify drain pan is properly installed and there are no leaks on water connection. Install kickplate. Remove internal packaging and labels and wipe unit down. Installer's information: Installer's name Installer's company Date 44

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

44
Performance Checklist
±
Verify cabinet size.
±
Verify electrical supply and water supply
(if applicable).
±
Install anti-tip device(s) and verify unit is
secure.
±
Position unit in cutout, level at desired
height and secure unit.
±
Plug-in unit and verify operation.
±
Connect water supply (if applicable).
• Verify icemaker fill tube is properly
inserted.
• Verify icemaker bail arm is down.
• Verify dispenser operation
(if applicable).
±
Align/square door(s).
±
Verify drain pan is properly installed and
there are no leaks on water connection.
±
Install kickplate.
±
Remove internal packaging and labels
and wipe unit down.
Installer’s information:
Installer’s name:
_____________________________
Installer’s company:
_________________________
Date:
________________________________________