Sharp PN-R706 PN-R Series Operation Manual - Page 65
Mounting Precautions, For SHARP dealers and service engineers
![]() |
View all Sharp PN-R706 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 65 highlights
Mounting Precautions (For SHARP dealers and service engineers) • When installing, removing or moving the monitor, ensure that this is carried out by at least 3 people. (PN-R556/PN-R496/PN-R426: at least 2 people.) • Be sure to use a wall-mount bracket designed or designated for mounting the monitor. • This monitor is designed to be installed on a concrete wall or pillar. Reinforced work might be necessary for some materials such as plaster / thin plastic board / wood before starting installation. • This monitor and bracket must be installed on a wall which can endure at least 4 times or more the weight of the monitor. Install by the most suitable method for the material and the structure. • To attach a VESA-compliant mounting bracket, use M6 screws that are 5/16 inch (8 mm) to 3/8 inch (10 mm) longer than the thickness of the mounting bracket. 5/16 - 3/8 inch (8-10 mm) Screws (M6) Mounting bracket Monitor mounting • Do not use an impact driver. • [PN-R706/PN-R606] When moving the monitor, be sure to hold the handles or the top, bottom, and side areas shown in Do not hold the LCD panel. This may cause product damage, failure, or injury. in the figure below. • [PN-R556/PN-R496/PN-R426] When moving the monitor, be sure to hold the top, bottom and side areas shown in LCD panel. This may cause product damage, failure, or injury. in the figure below. Do not hold the • After mounting, please carefully ensure the monitor is secure, and not able to come loose from the wall or mount. • Do not use any screw holes other than VESA holes for installation. • When using the monitor laying flat on a surface (when the monitor is tilted 20 degrees or more upward or downward from the perpendicular in relation to a level surface), consult an authorized SHARP dealer because there are some specific mounting conditions. • To conceal the eyebolt screw hole, affix an included hole cover sticker over the hole. 65 E
![](/manual_guide/products/sharp-pnr606-pnr-series-operation-manual-ea6cd12/65.png)