Pyle SLSNJWR50 Instruction Manual - Page 9

Climbing Net Maintenance, Product Disclaimer Notice

Page 9 highlights

CLIMBING NET MAINTENANCE At the beginning of each play season 1Tighten all hardware. 2Check all protective coverings on bolts, pipes, edges and corners. Replace if they are loose, cracked or missing. 3Check all moving parts including disks, ropes, cables, and chains for wear, rust, or other deterioration. Replace as needed. 4Check the rope and disks for deterioration, cracking or fraying. If found, DO NOT USE and dispose of immediately. 5X 3.1.1 Loose- ll Materials: X 3.1.1 Maintain a minimum depth of 9 inches of loose-fill materials such as wood mulch/chips, engineered wood fiber(EWF), or shredded/recycled rubber mulch for equipment up to 8 feet high; and 9 inches of sand or pea gravel for equipment up to 5 feet high. NOTE: An initial fill level of 12 inches will compress to about a 9-inch depth of surfacing over time. The surfacing will also compact, displace, and settle, and should be periodically refilled to maintain a least a 9-inch depth. PRODUCT DISCLAIMER NOTICE Any person purchasing, installing or using equipment must: 1. Obtain proper training and instruction regarding its proper use and safety precautions to always practice. 2. Ensure proper & adequate supervision and instruction (this include the continuous use of appropriate safety procedures equipment) for themselves and others using the equipment. 3. Check that all equipment is properly maintained, in good working order and inspected for damage or wear prior to each use. 4. You assume all risks and accept full responsibility for any injury (including death) or damages that may occur from its use. www.SereneLifeHome.com 9

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12

www.SereneLifeHome.com
9
CLIMBING NET MAINTENANCE
At the beginning of each play season
1
.
Tighten all hardware.
2
.
Check all protective coverings on bolts, pipes, edges and corners.
Replace if they are loose, cracked or missing.
3
.
Check all moving parts including disks, ropes, cables, and chains for wear, rust, or
other deterioration. Replace as needed.
4
.
Check the rope and disks for deterioration, cracking or fraying.
If found,
DO NOT USE
and dispose of immediately.
5
.
X 3.1.1 Loose-fill Materials:
X 3.1.1 Maintain a minimum depth of 9 inches of loose-fill materials such as
wood mulch/chips, engineered wood fiber(EWF), or shredded/recycled rubber
mulch for equipment up to 8 feet high; and 9 inches of sand or pea gravel for
equipment up to 5 feet high.
NOTE:
An initial fill level of 12 inches will compress to about a 9-inch depth of surfacing
over time. The surfacing will also compact, displace, and settle, and should be
periodically refilled to maintain a least a 9-inch depth.
PRODUCT DISCLAIMER NOTICE
Any person purchasing, installing or using equipment must:
1. Obtain proper training and instruction regarding its proper use and safety
precautions to always practice.
2. Ensure proper & adequate supervision and instruction (this include the continuous
use of appropriate safety procedures equipment) for themselves and others
using the equipment.
3. Check that all equipment is properly maintained, in good working order and
inspected for damage or wear prior to each use.
4. You assume all risks and accept full responsibility for any injury (including death)
or damages that may occur from its use.