Netgear GSM4328PB Hardware Installation Guide - Page 5
Installation, Maintenance and Troubleshooting
View all Netgear GSM4328PB manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
M4300 Intelligent Edge Series Fully Managed Stackable Switches PoE power budgets 45 Chapter 3 Installation Step 1: Prepare the site 48 Step 2: Protect against electrostatic discharge 48 Step 3: Unpack the switch 49 Step 4: Install the switch 51 Install a full-width switch in a rack 51 Install a single half-width switch in a rack 52 Install two half-width switches in a rack 54 Install the switch on a flat surface 56 Optional Step 5: Install SFP transceiver modules 56 Install an SFP transceiver module in a full 10G model 56 Install an SFP transceiver module in an uplink or combo port..57 Optional Step 6: Install a power supply unit 58 Optional Step 7: Connect a redundant power supply to model M4300-52G-POE 59 Step 8: Check the installation 60 Step 9: Apply AC power and check the LEDs 61 Optional Step 10: Connect a console to the switch 62 Chapter 4 Maintenance and Troubleshooting Replace a power supply unit 65 Replace a half-width switch in a rack 66 Troubleshooting chart 68 Additional troubleshooting suggestions 69 5