NEC NP-ME301X NP216 : NP01UCM (ceiling mount) instructions - Page 7
Flush Mount Application
View all NEC NP-ME301X manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 7 highlights
Flush Mount Application Screw ball and socket mount (A) into ceiling plate (G). Align the notch with one of the four holes of the ceiling plate (G) and secure ball and socket mount (A) with a M5 x 10 mm socket pin screw (C) using security allen wrench (B) as shown in detail 1. Note: Slotted set screw (K) is used to jam against the threads of the ball and socket mount to prevent any excess movement of the ball and socket mount (A). Do not overtighten screw; overtightening screw will damage threads making it difficult to separate the products. Skip to step 3. WOOD CEILING G A C A K NOTCH G DETAIL 1 Visit the NEC Web Site at www.necsam.com 7 of 9 ISSUED: 04-11-06 SHEET #: 055-9458-2 05-09-06 For customer care call 1-800-729-0307 or 708-865-8870.