LiftMaster RSW12U RSW12U Installation Manual - Page 12
Installation, Determine Location For Concrete Pad And Operator
View all LiftMaster RSW12U manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 12 highlights
INSTALLATION STEP 1 continued... DETERMINE LOCATION FOR CONCRETE PAD AND OPERATOR CHART INSTALLATION Refer to the illustration to determine the measurements and location of the concrete pad. Gate Hinge Center OUT A 4" (10.2 cm) maximum OUT IN NOTE: There should only be IN a maximum of 4" (10.2 cm) from the center of the hinge B to the edge of the post or Long Arm column. If the distance is E greater than 4" (10.2 cm) D entrapment protection for this area is required. C Short Arm D MINUS 10" 10" DISTANCE DISTANCE Wall Concrete Pad Dimension (A) thru (E) are from the center of one pivot point to the center of another pivot point. Caution: If the gate is longer than 18 feet, follow CHART A: A-2. Suggestion: The dimensions between the gate and the concrete pad is always 10 inches less than the dimension D. Example: D = 42", if the dimensions between the gate and the concrete pad is 32". DISTANCE If this dimension is between 20 and 32 inches, a compact installation is necessary. Refer to Appendix for compact installation instructions. CHART A ABCDE CHART B ABCDE 1 46" 35.5" 29.5" 35" 11" 45" 1 34.5" 34.75" 29.5" 35" 14" 43" 2 46.75" 35.5" 33.5" 42" 11" 37" 2 44" 36.5" 32.5" 42" 14" 32" 3 46.75" 37" 31.5" 40" 11" 41" 3 44" 37" 30.5" 40" 14" 40" 4 47.25" 37.25" 30" 37" 11" 45" 4 45" 37" 30.5" 37" 14" 43" 5 47" 35" 29.5" 32" 11" 45" 5 44.75" 35.75" 29.5" 32" 14" 44" 6 42.5" 33" 26.5" 28.5" 11" 41" 6 41" 39" 27.5" 28.5" 14" 41" 10