LiftMaster RSL12V RSL12V Installation Manual - Page 14
» Power Wiring + Connect Batteries - accessories
View all LiftMaster RSL12V manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
WIRING » POWER WIRING + CONNECT BATTERIES POWER WIRING SOLAR PANEL (NOT PROVIDED. SEE ACCESSORIES.) 3 The solar panel(s) must be located in an open area clear of obstructions and shading for the entire day. The gate operator is not supported in northern climates where temperatures reach below -4˚F. This is due to cold weather and a 2 reduced number of hours of sunlight during the winter months. Cycle rate may vary from solar chart for areas that reach below 32˚F. Solar panels should be cleaned on a regular basis for best performance to ensure proper operation. For solar applications, a minimum of 20W solar panels and two 7AH batteries are recommended. For Zone 3 cold weather sites, one 33AH battery is recommended. We recommend LiftMaster low power draw accessories to minimize power draw, refer to accessory page. NOT AVAILABLE 1 2 NUMBER OF CYCLES PER DAY 3 1 NOT AVAILABLE 1 Single Gate Installations (16 ft. 650 lb. gate) Accessories Zone 1 Zone 2 Zone 3 (6 Hrs sunlight/day) (4 Hrs Sunlight/day) (2 Hrs Sunlight/day) Dual Gate Installations (16 ft. 650 lb. gate) Accessories Zone 1 Zone 2 Zone 3 (6 Hrs sunlight/day) (4 Hrs Sunlight/day) (2 Hrs Sunlight/day) Solenoid Lock 50 mA 100 mA 300 mA 2 7AH Batteries (optional) 1 33AH Battery (optional) 2 7AH Batteries (optional) 1 33AH Battery (optional) 1 33AH Battery (optional) Solenoid Lock 50 mA 100 mA 300 mA 2 7AH Batteries (optional) 1 33AH Battery (optional) 2 7AH Batteries (optional) 1 33AH Battery (optional) 1 33AH Battery (optional) 20W SOLAR PANEL 30W SOLAR PANEL 50 50 ✔ 48 50 ✔ 50 50 ✔ 41 49 ✔1 9 50 50 ✔ 50 50 ✔ 50 50 ✔ 50 50 ✔ 30 43 38 43 32 36 30 35 21 26 0 0 50 50 48 50 50 50 41 50 1 9 20 17 12 3 0 31 26 24 15 0 20W SOLAR PANEL 30W SOLAR PANEL 25 29 ✔ 23 27 ✔ 22 26 ✔ 18 22 ✔0 4 39 45 ✔ 35 41 ✔ 35 41 ✔ 31 37 ✔ 13 19 17 19 15 17 13 15 9 12 0 0 25 29 23 27 22 26 18 22 0 4 CONNECT BATTERIES The batteries are charged in the circuit by using the transformer (provided) or an optional solar panel. Batteries will degrade over time depending on temperature and usage. For best performance, the batteries should be replaced every 3 years. Batteries do not perform well in extremely cold temperatures. The operator comes with one 7AH battery. A second 7AH (29-NP712) battery may be added or one 33AH (A12330SGLPK) may be used in place of the 7AH batteries. NOTE: There may not be sufficient mounting space for the 33AH battery if a heater is installed. Connector Battery Plug Always disconnect the batteries BEFORE servicing the operator. NOTE: Setting the battery on concrete will not have a negative affect on the charging or battery life. 1 If the installation is a dual gate, proceed to next page. 21 Locate the battery plug. Connect the battery plug to either connector on the control board. Provided NUMBER OF CYCLES FOR BATTERY BACKUP 9 8 5 1 0 14 13 10 6 0 2 Optional (not provided) Accessories Single Gate (16 ft. 650 lb. gate) Accessories Dual Gate (16 ft. 650 lb. gate) Solenoid Lock 50 mA 100 mA 300 mA 1 7AH Battery (standard) 2 7AH Batteries (optional) 1 33AH Battery (optional) Solenoid Lock 50 mA 100 mA 300 mA 1 7AH Battery (standard) 2 7AH Batteries (optional) 1 33AH Battery (optional) BATTERY BACKUP (BBU) ✔ ✔ ✔ 40 36 43 42 100 83 98 97 275 228 269 267 BATTERY BACKUP (BBU) ✔ ✔ ✔ 19 17 19 19 44 40 44 43 121 111 121 120 ✔ 41 94 258 ✔ 19 43 118 13