LiftMaster RSL12UL Owners Manual - English French - Page 16
Power Wiring, Maximum Wire Length, American Wire, Gauge Awg, Direct Plug-in, Transformer 120 Vac
View all LiftMaster RSL12UL manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
INSTALLATION Power wiring 1. Turn off the AC power from the main power source circuit breaker. 2. Run the AC power wires to the operator. 3. Unplug the transformer. 4. Remove the junction box cover. 5. Run the AC power wires through the knockout in the bottom of the electrical box. 6. Connect the green wire to the earth ground rod and AC ground using a wire nut. NOTE: The earth ground rod can be grounded to the chassis. 7. Connect the white wire to NEUTRAL using a wire nut. 8. Connect the black wire to HOT using a wire nut. 9. Replace the junction box cover. Ensure the wires are not pinched. 10. Plug in the transformer. 11. Turn ON AC power to the operator. MAXIMUM WIRE LENGTH AMERICAN WIRE DIRECT PLUG-IN EXTERNAL PLUG-IN GAUGE (AWG) TRANSFORMER (120 VAC) TRANSFORMER (24 VAC) 18 150 feet (46 m) 16 250 feet (76 m) 14 1150 feet (351 m) 400 feet (122 m) 12 1850 feet (564 m) 600 feet (183 m) 10 2950 feet (899 m) 1,000 feet (305 m) NOTE: Use copper conductors ONLY. 16