HP D5970A HP Netserver LC 2000r Rack Cabling Reference Guide - Page 62
Power Distribution Unit
![]() |
View all HP D5970A manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 62 highlights
Index illustration of rack receptacles, 36 procedure, 35 Power Distribution ensure the PDU is mounted, 32 Power Distribution Unit 120 VAC illustration, 39 120 VAC, 16 amp, 19 208 VAC illustration, 42 208 VAC, LC 2000r configuration, 40 208/240 VAC, 10 amp extension, 19 208/240 VAC, 16 amp, 19 230/240 VAC illustration, 42, 44 configuration guidelines, 23 configurations for LC 2000r, 21 determining and balancing load on double PDUs, 35 models, illustration, 21 placement for the LC 2000r rack, 20 position in the rack, 22 power down, 50 power off sequence, 50 power preparation checklist, 3 power strip. See Power Distribution Unit power up minimizing current inrush, 6 power up sequence, 50 preparation guidelines checklist, 3 R rack assembly assemble enclosure, 9 cabling overview, 32 cabling summary, 12 configuration planning, 11 doors and side panels, 13 mount door hinge and latch first, 10 mounting units, 11 preparation, 7, 8 procedure, 11 site preparation, 7 58 tying two racks together, 10 unpacking the rack, 8 verify and unpack shipment, 7 rack layout, 11 rack power configurations 208 VAC PDU, 41 230/240 VAC, 44 PDU 120 VAC, 39 plugs and receptacles, 16 Redimdamt Switch order of installation, 11 S safety anti tip foot use, 8 anti-tip features, 9 care in lifting units, 7 do not daisy chain 120 VAC, 37 electrical ground connection for the rack, 6 electrical shock prevention, 6 electrostatic damage (ESD) prevention, 6 extend one unit at a time, 9 leveler screws, 8 lifting precautions, 8 moving racks safely, 8 preventing component damage, 6 rear latch removal, 10 remove power supplies, 9 use attached rack mounting handles, 9 Safety rack cabling, 5 shipment to a second location packaging materials, 7 remove and save shipping panels, 9 side panels removal of, 10 site preparation, 2 checklist, 3 circuit breakers, 4 summary, 7 space requirements
![](/manual_guide/products/hewlettpackard-lh3000r-hp-netserver-lc-2000r-rack-cabling-reference-guide-1ba3ceb/62.png)