GE PV977NSS Use and Care Manual - Page 23
Step 7, Determine Duct Length, And Install Duct, Install Hood Assembly, To Ceiling Support
![]() |
UPC - 084691174769
View all GE PV977NSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
Installation Instructions STEP 7 DETERMINE DUCT LENGTH AND INSTALL DUCT • Measure from the hood exhaust opening to the top of the supports as shown in the figure. • Subtract the height of the air deflector. • Cut the 8" duct to the appropriate length. Attach to air deflector using aluminized tape and screws. Length of duct needed minus the length protruding through the ceiling. STEP 8 INSTALL HOOD ASSEMBLY TO CEILING SUPPORT WARNING: Two people are required to lift and position the hood onto the support. • Carefully lift the hood assembly to the ceiling support. The clips on the ceiling support will snap into the openings on the vertical supports. • Slip the duct over the exhaust opening. • Using the screws provided, attach the upper vertical supports to the ceiling support, 2 screws per side for a total of 16 screws. • Seal the air duct to the exhaust opening using aluminized duct tape. Clips Ceiling support Air deflector Tape with aluminized duct tape 23
![](/manual_guide/products/general-electric-pv977nss-use-care-manual-e6ea789/23.png)