GE GDWT360RSS Installation Instructions - Page 6
Installation Preparation-Hot Water Supply, CAUTION, PRECAUCIÓN
UPC - 084691207047
View all GE GDWT360RSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
Installation Preparation-Hot Water Supply PREPARE HOT WATER SUPPLY Hot Water Line • The line may enter from either side, rear or floor within the shaded area shown in Figure F. • The line may pass through the same hole as the electrical cable and drain hose, or an additional 1-1/2" diameter hole may be cut to accommodate the water line. If a power cord with plug is used, the water line must not pass through the power cord hole. CAUTION The hot water supply line pressure must be at least 20 PSI. Lower pressures could cause the water valve to leak and cause water damage. PRECAUCIÓN La línea de presión del suministro de agua caliente debe ser al menos 20 PSI. Presiones inferiores podrían causar que la válvula del agua gotee y causar daños por agua. 1-1/2" Dia. Shut-off Hole 5" 4" Valve Hot 2" From Cabinet 19" From Wall 5" 4" 6" Cabinet Face Figure F 2" From Floor Water Line Connection • Turn off the water supply. • Install a hand shut-off valve in an accessible location, such as under the sink. (Optional, but strongly recommended and may be required by local codes.) • The water connection is on the bottom-left side of the dishwasher. Install the hot water inlet line, using 3/8" or larger copper tubing. Route the line as shown in Figure F and extend forward at least 19" from rear wall. • Adjust the water heater to deliver water between 120°F and 150°F. • Flush water line to clean out debris. Use a bucket to catch water and debris. • The hot water supply line pressure must be between 20 and 120 PSI. 6