Dell P8624QT Monitor Teardown Instructions - Page 2
Torque: 4.5, 5kgfkgf, Torque: 2, Torque: 3, Torque:4.5
View all Dell P8624QT manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 2 highlights
2 DELL 8624QT Use a Hex-head screwdriver to remove 2pcs screws for unlocking VGA connectors. (Torque: 4.5kgf±0.5) Use a screwdriver to remove 12pcs screws for S9 unlocking the USB board, IO holder and main board, remove 17pcs screws for locking the power board, driver board, touch board and T-Con board. (Torque: 4.5kgf±0.3) Disconnect all the FFC cables away from the T-con board. Use a screwdriver to remove 38pcs screws for S12 unlocking the front bezels(top, left, right, bottom). (Torque: 3±0.3kgf) main board Use a screwdriver to remove 15pcs screws for unlocking H-beam with the assembled unit, and then S13 remove the H-Beam. (Torque: 4.5±0.5kgf) 14pcs screws 1 2 3 4 Disconnect the touch cable and FFC cables. Use a screwdriver to remove 24pcs(16+8) screws S14 (Torque:4.5±0.5kgf) for unlocking the ED holder with the assembled unit. Use a screwdriver to remove 40pcs screws S10 (left: 10pcs, right :10pcs, top: 10pcs, bottom: 10pcs) for unlocking 4pcs strips.(Torque: 4.5±0.5kgfkgf) Use a screwdriver to remove 2pcs screws for S11 unlocking the key board and the holder with strip. (Torque: 2±0.3kgf) Remove all the bezel and strips and put them on a protective cushion. Open the IR board cover, then use a screwdriver to remove 2pcs screws for unlocking the S15 IR board and holder with front bezel, then use a screwdriver to remove 2pcs screws for unlocking the light pipe with front bezel. (Torque: 3±0.3kgf)