Dell P8624QT Monitor Teardown Instructions - Page 2

Torque: 4.5, 5kgfkgf, Torque: 2, Torque: 3, Torque:4.5

Page 2 highlights

2 DELL 8624QT Use a Hex-head screwdriver to remove 2pcs screws for unlocking VGA connectors. (Torque: 4.5kgf±0.5) Use a screwdriver to remove 12pcs screws for S9 unlocking the USB board, IO holder and main board, remove 17pcs screws for locking the power board, driver board, touch board and T-Con board. (Torque: 4.5kgf±0.3) Disconnect all the FFC cables away from the T-con board. Use a screwdriver to remove 38pcs screws for S12 unlocking the front bezels(top, left, right, bottom). (Torque: 3±0.3kgf) main board Use a screwdriver to remove 15pcs screws for unlocking H-beam with the assembled unit, and then S13 remove the H-Beam. (Torque: 4.5±0.5kgf) 14pcs screws 1 2 3 4 Disconnect the touch cable and FFC cables. Use a screwdriver to remove 24pcs(16+8) screws S14 (Torque:4.5±0.5kgf) for unlocking the ED holder with the assembled unit. Use a screwdriver to remove 40pcs screws S10 (left: 10pcs, right :10pcs, top: 10pcs, bottom: 10pcs) for unlocking 4pcs strips.(Torque: 4.5±0.5kgfkgf) Use a screwdriver to remove 2pcs screws for S11 unlocking the key board and the holder with strip. (Torque: 2±0.3kgf) Remove all the bezel and strips and put them on a protective cushion. Open the IR board cover, then use a screwdriver to remove 2pcs screws for unlocking the S15 IR board and holder with front bezel, then use a screwdriver to remove 2pcs screws for unlocking the light pipe with front bezel. (Torque: 3±0.3kgf)

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6

2
DELL
86
24QT
4
1
2
3
Use a Hex-head screwdriver to remove 2pcs screws
for unlocking VGA connectors.
(Torque: 4.5kgf
±
0.5)
Use a screwdriver to remove 12pcs screws for
unlocking the USB board, IO holder and main board,
remove 17pcs screws for locking the power board,
driver board, touch board and T-Con board.
(Torque:
4.5kgf
±
0.3)
Disconnect all the FFC cables away from
the T-con board.
S9
14pcs screws
main board
Use a screwdriver to remove 40pcs screws
(left: 10pcs, right :10pcs, top: 10pcs, bottom: 10pcs)
for unlocking 4pcs strips.
(Torque: 4.5
±
0.5kgfkgf)
S11
S10
(Torque: 2
±
0.3kgf)
Use a screwdriver to remove 2pcs screws for
unlocking the key board and the holder with strip.
Use a screwdriver to remove 38pcs screws for
unlocking the front bezels(top, left, right, bottom).
(Torque: 3
±
0.3kgf)
S12
Use a screwdriver to remove 15pcs screws for
unlocking H-beam with the assembled unit, and then
remove the H-Beam.
(Torque: 4.5
±
0.5kgf)
S13
S14
Disconnect the touch cable and FFC cables. Use a
screwdriver to remove 24pcs(16+8) screws
(Torque:4.5
±
0.5kgf)
for unlocking the ED holder with
the assembled unit.
S15
Remove all the bezel and strips and put them on a
protective cushion. Open the IR board cover, then use
a screwdriver to remove 2pcs screws for unlocking the
IR board and holder with front bezel, then use a
screwdriver to remove 2pcs screws for unlocking the
light pipe with front bezel.
(Torque: 3
±
0.3kgf)