3Com 3824 Implementation Guide - Page 25

Connect port 2 on the upper Switch to port 2 on the lower Switch., Prepare ports 2

Page 25 highlights

Aggregated Links 25 Figure 6 An 8 Gbps aggregated link between two Switch units Switch 8 Gbps Aggregated Link Switch To manually set up this configuration: 1 Prepare ports 2, 4, 6 and 8 on the upper Switch for aggregated links. To do this: a Check that the ports have an identical configuration using your preferred management interface. b Add the ports 2, 4, 6 and 8 on the specified unit to the aggregated link. 2 Prepare ports 2, 4, 6 and 8 on the lower Switch for aggregated links. To do this: a Check that the ports have an identical configuration using your preferred management interface. b Add the ports 2, 4, 6 and 8 on the specified unit to the aggregated link. 3 Connect port 2 on the upper Switch to port 2 on the lower Switch. 4 Connect port 4 on the upper Switch to port 4 on the lower Switch. 5 Connect port 6 on the upper Switch to port 6 on the lower Switch. 6 Connect port 8 on the upper Switch to port 8 on the lower Switch.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102

Aggregated Links
25
Figure 6
An 8 Gbps aggregated link between two Switch units
To manually set up this configuration:
1
Prepare ports 2, 4, 6 and 8 on the upper Switch for aggregated links. To
do this:
a
Check that the ports have an identical configuration using your
preferred management interface.
b
Add the ports 2, 4, 6 and 8 on the specified unit to the aggregated
link.
2
Prepare ports 2, 4, 6 and 8 on the lower Switch for aggregated links. To
do this:
a
Check that the ports have an identical configuration using your
preferred management interface.
b
Add the ports 2, 4, 6 and 8 on the specified unit to the aggregated
link.
3
Connect port 2 on the upper Switch to port 2 on the lower Switch.
4
Connect port 4 on the upper Switch to port 4 on the lower Switch.
5
Connect port 6 on the upper Switch to port 6 on the lower Switch.
6
Connect port 8 on the upper Switch to port 8 on the lower Switch.
Switch
Switch
8 Gbps Aggregated Link