Panasonic FV-15VQ3 Installation Instructions

Panasonic FV-15VQ3 Manual

Panasonic FV-15VQ3 manual content summary:

  • Panasonic FV-15VQ3 | Installation Instructions - Page 1
    INSTALLATION INSTRUCTIONS Ventilating Fan FV-05VQ3 FV-08VQ3 FV-11VQ3 FV-15VQ4 Panasonid READ AND SAVE THESE INSTRUCTIONS. Please read these instructions carefully before attempting to install, operate or service the Panasonic Ventilating Fan. Failure to comply with instructions could result in
  • Panasonic FV-15VQ3 | Installation Instructions - Page 2
    SUPPLIED ACCESSORIES FV-05VQ3 FV-08VQ3 FV-11VQ3 FV-15VQ4 Part name Appearance Quantity Grille 1 Long screw (ST4.2X20) 6 Panasonic ceiling mount ventilation fans use a sirocco fan with dolphin-shaped blades driven by a capacitor motor. The motor is designed to have an extended service
  • Panasonic FV-15VQ3 | Installation Instructions - Page 3
    5 1 3/4 (46) Unit: inches(mm) 2 5 1/8 (130) 4 7 7/8 (200) 3 10 1/4 (261) 3 1/2 (90) FV-08VQ3 FV-11VQ3 FV-15VQ4 RD /1 / (2, i. / (The dimension in square brackets refers to FV-15VQ4 which is different from FV-08/11VQ3) 3 1 2 (90) r 1 (25) 1 (26 3/4 (45) / 5 0 I (259) Ra . v NVN
  • Panasonic FV-15VQ3 | Installation Instructions - Page 4
    that the electric service supply voltage is 120 V, 60 Hz. 3. Follow all local electrical and safety codes, as well as the National Electrical Code (NEC) and the Occupation Safety and Health Act (OSHA). 4. Always disconnect the power source before working on or near the fan, motor or junction box
  • Panasonic FV-15VQ3 | Installation Instructions - Page 5
    or drilling into wall or ceiling, do not damage electrical wiring and other hidden utilities. E. Ducted fans must always be vented to the outdoors. F. These models are UL listed for tub and shower enclosures. G. Before servicing or cleaning unit, switch power off at service panel and lock the
  • Panasonic FV-15VQ3 | Installation Instructions - Page 6
    adaptor before installation. As shown below: Adaptor - - Damper Tape 2. Insert the suspension bracket into the fan body and adaptor. (Select the suspension bracket as shown below) A .1 a Fan body a CI F I~ Joists Spacing A on center joists Insert Suspension bracket 12 inches Refer to Fig
  • Panasonic FV-15VQ3 | Installation Instructions - Page 7
    diagram below. Using wire nuts, connect house power wires to ventilating fan wires: black to black; white to white; green to green; Replace the junction box cover. (Fig.5) Wiring diagram Fan body Red Junction box Motor Capacitor White" White White Neutra-l > Power Supply Black kBlac Black
  • Panasonic FV-15VQ3 | Installation Instructions - Page 8
    slots as shown and mount grille to fan body. (Fig.7) Note: Suitable for use with solid-state speed controls. Solid-state speed controls may cause harmonic distortion which can cause a motor humming noise. 0 / Ceiling inches (mm) Slot Ceiling Fig. 6 Mounting spring Grille Fig. 7 INSTALLATION II
  • Panasonic FV-15VQ3 | Installation Instructions - Page 9
    suspension bracket to joists by using long screws (ST4.2X20) and secure it to fan body by using screw II (ST4.2X10) in vertical direction. (Fig.11) 8. Screws O O a a Adaptor a a a Fig.12-1 3. Remove adaptor from fan body and secure it to joists as in Fig.8 of page 8. Blower Joist Conduit
  • Panasonic FV-15VQ3 | Installation Instructions - Page 10
    Suspension bracket M 19.2 Inches vertical joist 2. Insert the suspension bracket into the bracket cover of • adaptor side and the back of the fan body. (Fig.15) (select the suspension bracket according to spacing A Zi44O1%1",4, itz44p as shown below) A 16 Inches and 19.2 Inches horizental
  • Panasonic FV-15VQ3 | Installation Instructions - Page 11
    level and square (perpendicular) with the joists. (Fig.16) Joists Ensure that distance B (7/8 inch, 21.6mm) for the thickness of ceiling board. Adaptor Fan body Junction box 13 1/4-15 3/4 (336-400) A 16 1/2-16 3/4 (419-4B0) 3-5 ( 76-126 ) 5 4/5-7 4/5 148-198) 4. Secure the suspension bracket
  • Panasonic FV-15VQ3 | Installation Instructions - Page 12
    shall interfere with installation. (2) Inspect duct work and wiring before proceeding with installation. (3) Plan suitable location for fan body. (next to ceiling joist) (4) Before installation, provide inspection and maintenance access at a location that will not interfere with installation work
  • Panasonic FV-15VQ3 | Installation Instructions - Page 13
    , thinner or any other such chemicals for cleaning the ventilating fan. 2. Do not damp water to motor. 3. Do not soak resin parts in fan body using a vacuum cleaner. (Fig.23) 4. Using a cloth dampened with kitchen detergent, remove any dirt from fan body. Wipe dry with new cloth. (Fig.24) 5. Replace
  • Panasonic FV-15VQ3 | Installation Instructions - Page 14
    can be placed directly over the fan housing in the attic. Panasonic fans and fan/light combination units do not create excessive heat that is a common problem with recessed light fixtures or some competitors' fan/light combinations. Our efficient, cool-running motors and our fluorescent bulbs do not
  • Panasonic FV-15VQ3 | Installation Instructions - Page 15
    PANASONIC CONSUMER ELECTRONICS COMPANY Division of Panasonic Corporation of North America, One Panasonic Way, Secaucus, NJ 07094 PANASONIC CANADA INC. 5770 Ambler Driver, Mississauga, ON L4W 2T3 www.panasonic.com X1204-8189 08VQ34020G
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15

INSTALLATION
INSTRUCTIONS
Ventilating
Fan
FV-05VQ3
FV-08VQ3
FV-11VQ3
FV-15VQ4
Panasonid
READ
AND
SAVE
THESE
INSTRUCTIONS.
Please
read
these
instructions
carefully
before
attempting
to
install,
operate
or
service
the
Panasonic
Ventilating
Fan.
Failure
to
comply
with
instructions
could
result
in
personal
injury
and/or
property
damage.
Please
retain
this
booklet
for
future
reference.
Table
of
Contents
Supplied
Accessories
2
Description
2
Wiring
diagram
2
Dimensions
3
Specifications
4
Unpacking
4
General
Safety
Information
4-5
Installation
I
(
Joist
Mounting
-I
)
6-8
Installation
II
(
Joist
Mounting
-II
)
8-9
Installation
II
I
(
I
-Joist
Mounting
)
10
Installation
IV
(
Between
Joist
Mounting
)
10-11
Installation
V
(
Wooden
Header
)
12
Installation
VI(
In
Existing
Construction
)
12
Maintenance
13
Practical
Guide
to
Installation
14
Product
Service
14